Air conditioning installation at Malabar. Our company installed VRV Daikin system for a large house at Malabar. Installation has been done in two stages: during construction (when walls and ceiling are open and it is very easy to run copper pipes and cables) and final step when we are going to install wall linear grills. VRV system is good to install when there is no space in the roof for proper ducted system.